Suspension roller process
(1) steel skeleton displacement deformation
In the process of the suspension roller process, due to the use of dry hard concrete, steel skeleton by the larger radial pressure, and with the feeding side of the rolling and rotation process, repeated role is gradually strengthened, resulting in Skeleton deformation, displacement. The way to avoid this is to enhance the overall rigidity of the steel frame, to strengthen the fixing of the skeleton in the pipe mold, and to control the steel bar of the protective layer into the U-shaped steel bar and increase the error to about 2mm.
(2) the inner and outer walls collapse
The phenomena of wall collapse, wall separation and pipe - die separation are the quality problems of suspension pipe, especially in the environment of low temperature. With the increase of diameter, the self - arching effect of circular arc decreases. Wall thickness increased, the upper part of the concrete gravity increased. While lifting the process of vibration, it is necessary to produce wall collapse, the outer wall from the mold off. Avoid the way is: try to produce the diameter of 1000mm below the strict control of water-cement ratio and reduce the vibration generated during the lifting process while prolonged listening time.
(1) steel skeleton displacement deformation
In the process of the suspension roller process, due to the use of dry hard concrete, steel skeleton by the larger radial pressure, and with the feeding side of the rolling and rotation process, repeated role is gradually strengthened, resulting in Skeleton deformation, displacement. The way to avoid this is to enhance the overall rigidity of the steel frame, to strengthen the fixing of the skeleton in the pipe mold, and to control the steel bar of the protective layer into the U-shaped steel bar and increase the error to about 2mm.
(2) the inner and outer walls collapse
The phenomena of wall collapse, wall separation and pipe - die separation are the quality problems of suspension pipe, especially in the environment of low temperature. With the increase of diameter, the self - arching effect of circular arc decreases. Wall thickness increased, the upper part of the concrete gravity increased. While lifting the process of vibration, it is necessary to produce wall collapse, the outer wall from the mold off. Avoid the way is: try to produce the diameter of 1000mm below the strict control of water-cement ratio and reduce the vibration generated during the lifting process while prolonged listening time.
Tags: SICOMA Planetary Concrete Mixerstand up skid loaderfly ash brick machine manufacturersMixer Pumps truck mixers for saleboom concrete
Previous: Failure analysis and troubleshooting for Wire Cage Welding Machine
Next: Sorry,This is the last Page!
НОВОСТИ
- Hamac is attending Philconstruct 2018 Exhibition in Manila, Philippines
- Good news for all the customers, big sales promotion!
- Concrete Pump and concrete mixers were sent to South America
- HZS25 Concrete Batching Plant Delivered to Africa
- HC45Y skid steer loader will be shipped to Southeast Asia
- SICOMA MAO4500/3000 Double Shaft Concrete Mixer Was Sent to Bolivia
- Self loading cement mixer
- Fiori concrete mixer for sale self loading concrete mixer machine
- HAMAC Self loading concrete mixer ,front discharge mixer trucks for sale, ajax fiori concrete mixer for sale, self loading concrete mixer machine
Оборудование
Бетономешалки
Бетонный завод
Бетононасосный завод
- HBT/DHBT series Concrete Pump
- Truck-mounted Concrete Boom Pump
- Truck Mounted Concrete Pump
- Elevator shaft Self-climbing Concrete Placing Boom
- Mobile Hydraulic Concrete Placing Boom
- Floor climbing Hydraulic Concrete Placing Boom
- Concrete Transit Mixers
- XBS/DXBS Fine Stone Concrete Pump
- Manual Concrete Placing Boom